Dust-control demand savings calculator
Dust-control demand savings
The reference estimates reduction from concurrent machines, not from average daily running time.
Units
Sd=ηmhp×0.746×rpeak×cd,month×12
Sd=ηmPshaft×rpeak×cd,month×12
Calculator
Enter the values you know and leave one box empty. Calculate finds the empty one, the result or any input.
Worked example
Given
- hp = 55 hp
- ηm = 0.89 fraction
- rpeak = 0.3 fraction
- cd,month = 12 $/kW·month
Sd=0.8955×0.746×0.3×12×12≈1,992
Given
- Pshaft = 40 kW
- ηm = 0.9 fraction
- rpeak = 0.3 fraction
- cd,month = 12 $/kW·month
Sd=0.940×0.3×12×12=1,920
Symbols and units
| Symbol | Meaning | Unit |
| Sd | annual demand savings | $/yr |
| hp | motor horsepower at the case full load | hp |
| ηm | motor efficiency | fraction |
| rpeak | fraction of demand reduced during billing interval | fraction |
| cd,month | monthly demand price | $/kW·month |
| Symbol | Meaning | Unit |
| Sd | annual demand savings | $/yr |
| Pshaft | shaft power expressed as kilowatts | kW |
| ηm | motor efficiency | fraction |
| rpeak | fraction of demand reduced during billing interval | fraction |
| cd,month | monthly demand price | $/kW·month |
Results are estimates for study and screening. Check the inputs, units and assumptions before you use them for design, billing or contract decisions.