Failure and production-interruption cost calculator
Failure and production-interruption cost
A repair bill alone omits the lost production contribution during an outage.
Cfailure=Crepair+Hdown×cdown
Calculator
Enter the values you know and leave one box empty. Calculate finds the empty one, the result or any input.
Worked example
Given
- Crepair = 2,400 $
- Hdown = 7 h
- cdown = 850 $/h
Cfailure=2400+7×850=8,350
Symbols and units
| Symbol | Meaning | Unit |
| Cfailure | total event cost | $ |
| Crepair | direct repair cost | $ |
| Hdown | production interruption | h |
| cdown | lost contribution per hour | $/h |
Results are estimates for study and screening. Check the inputs, units and assumptions before you use them for design, billing or contract decisions.