Calculators › Renewables and on-site generation
Cooling-tower evaporation rule calculator
Cooling-tower evaporation rule
Approximation: for each 10 Δ°F cooling range, about 1% of circulation evaporates in the reference rule. Approximation: for each 5.56 Δ°C cooling range, about 1% of circulation evaporates in the reference rule.
Units IP (US) SI (metric)
V ˙ evap = V ˙ circulating × 0.01 × Δ T 10 \dot{V}_{\text{evap}} = \frac{\dot{V}_{\text{circulating}} \times 0.01 \times \Delta T}{10} V ˙ evap = 10 V ˙ circulating × 0.01 × Δ T
V ˙ evap = V ˙ circulating × 0.01 × Δ T × 9 50 \dot{V}_{\text{evap}} = \frac{\dot{V}_{\text{circulating}} \times 0.01 \times \Delta T \times 9}{50} V ˙ evap = 50 V ˙ circulating × 0.01 × Δ T × 9
Calculator
Enter the values you know and leave one box empty. Calculate finds the empty one, the result or any input.
Worked example
Given
V ˙ circulating \dot{V}_{\text{circulating}} V ˙ circulating = 2,400 gpm Δ T \Delta T Δ T = 12 °F
V ˙ evap = 2400 × 0.01 × 12 10 = 28.8 \dot{V}_{\text{evap}} = \frac{2400 \times 0.01 \times 12}{10} = 28.8 V ˙ evap = 10 2400 × 0.01 × 12 = 28.8
Given
V ˙ circulating \dot{V}_{\text{circulating}} V ˙ circulating = 150 L/s Δ T \Delta T Δ T = 6 K
V ˙ evap = 150 × 0.01 × 6 × 9 50 = 1.62 \dot{V}_{\text{evap}} = \frac{150 \times 0.01 \times 6 \times 9}{50} = 1.62 V ˙ evap = 50 150 × 0.01 × 6 × 9 = 1.62
Symbols and units
Symbol Meaning Unit
V ˙ evap \dot{V}_{\text{evap}} V ˙ evap evaporation flow gpm
V ˙ circulating \dot{V}_{\text{circulating}} V ˙ circulating circulating-water flow gpm
Δ T \Delta T Δ T tower water temperature drop °F
Symbol Meaning Unit
V ˙ evap \dot{V}_{\text{evap}} V ˙ evap evaporation flow L/s
V ˙ circulating \dot{V}_{\text{circulating}} V ˙ circulating circulating-water flow L/s
Δ T \Delta T Δ T tower water temperature drop K
Studying for the CEM® exam?
The ClueLuma CEM app has 1,041 calculation-focused practice questions, a formula calculator like this one in every question, and an endless drill where the numbers change every time. Try it free, no card needed.
Results are estimates for study and screening. Check the inputs, units and assumptions before you use them for design, billing or contract decisions.